Horse Hollow
Transmission “Miracle Project”
2009
Abilene, TX – San Antonio,
TX
- Over 275 miles of OPGW splicing
completed in 17 days
- 113 splice locations of
48 count OPGW
- Turnkey construction &
installation of fiber optic
repeater huts & SCADA
system
- Additional splicing at
substations, repeater huts,
and feeders
- Bi-directional span testing
& bi-directional end to
end OTDR & power meter
testing
- Pre installation fiber
optic reel testing
|
|
 |
Synchronous
Optical Network Upgrade OPGW installation
for El Paso Electric 2009 El Paso,
TX
- 39 splice locations of 48
count OPGW
- Termination of fiber optic
cable in duct at 8 substations
- Pre installation fiber
optic reel testing
- Bi-directional end to end
OTDR and power meter testing
|
|
 |
Ault to Cheyenne
WAPA Transmission Project 2009
Ault, CO – Cheyenne, WY
- 28 splice locations of 24
count OPGW
- Termination and splicing
inside of substations
- Pre installation fiber
optic reel tests
- Bi-directional end to end
OTDR and power meter testing
|
|
 |
Eerie to Hoyt
WAPA Transmission Project 2009
Eerie, CO – Hoyt, CO
- 25 splice locations of 48
count OPGW
- Termination and splicing
in substations
- Pre installation fiber
optic reel tests
- Bi-directional end to end
OTDR and power meter testing
|
|
 |
Buck to Julian
Hinds Transmission Project 2009
Blythe, CA
- 23 Splice locations of 24
count OPGW
- Termination and splicing
in substations
- Pre installation fiber
optic reel tests
- Bi-directional end to end
OTDR and power meter testing
|
|
 |
|
 |
|
 |
|
|
|
|
|
 |
|
 |
 |
|